Rayson PrimeBond · Primers & bonding coats
Rayson PrimeBond S30 is a two-part, low-viscosity, solvent-based epoxy primer that penetrates and seals prepared concrete, pavements and mineral substrates before coating.
PrimeBond S30 uses a low-viscosity, solvent-based epoxy formulation to soak into prepared concrete and bind the surface before the floor system goes down. The two parts mix 1:1 and react to form a long-lasting sealing coat with excellent adhesion — pull-off testing on prepared concrete produces failure in the concrete, not the primer.
Primer.
Figure 1 — Typical system build-up (top to bottom). Layer thicknesses are system-dependent; confirm the specification for your project.
| Surface preparation | Substrate must be sound, clean and free of oil, grease, laitance, loose material and bond-inhibiting contaminants. Prepare concrete mechanically (captive shot blasting, milling or diamond grinding); remove weak concrete, open blowholes and voids, and reinstate imperfections with a suitable Rayson repair product. Vacuum all dust. New concrete should be at least 28 days old. |
|---|---|
| Mixing / dilution | Two pre-weighed parts, mix ratio 1:1 by weight; mix mechanically for at least 2–3 minutes; pot life up to 30 minutes at 28 °C |
| Application method | Roller, Brush, Airless spray |
| Coverage | 5–6 m² per litre per coat; minimum 2 coats on normal or dense concrete — varies with substrate porosity |
| Application conditions | Minimum substrate temperature 5 °C; substrate moisture content max 5%; minimum mixing temperature +10 °C; cure between +10 °C and +35 °C; prepared substrate pull-off strength above 1.5 N/mm². |
| Drying & curing | Final cure 7 days; minimise heavy traffic for 8 hours after application on pavements |
| Recoat interval | Confirm the recoat window with the Rayson technical team. |
| Film / thickness | Penetrating primer; consumption governs film. |
| Pack sizes | Part A 10 litres / Part B 10 litres per set |
| Storage | Minimum 12 months at 5–30 °C in unopened original packaging; protect from direct sunlight. |
| Shelf life | Approximately 12 months unopened; sunlight exposure reduces shelf life. |
Figure 2 — Application workflow. Each stage is a hold point: confirm the previous stage is complete and within specification before proceeding.
Exterior PU deck system
Dense concrete sealing